Southeast Loop

Location: East/west travel between SH 130 and FM 3349 and north/south travel to US 79 in Precinct 4

Description: Williamson County conducted a study to consider connections for east/west travel between SH 130 and FM 3349 and north/south travel to US 79. The schematic was completed in spring 2020, and right-of-way acquisition is underway. As part of the Southeast Loop Study, the FM 3349 at US 79 project was identified and proposed due to the need for a grade-separated crossing over the Union Pacific Railroad and US 79. For information on the FM 3349 at US 79 project, click here.

Status: Construction of the first segment of the Southeast Loop began in summer 2021 and includes a new roadway with one lane in each direction and a center turn lane from CR 138 at Dana Drive to CR 137. The project also includes widening the existing CR 138 pavement to add a dedicated right-turn lane from westbound CR 138 to northbound SH 130 and resurfacing and restriping the pavement in front of the Lakeside Estates neighborhood. Funding for construction was secured through the voter-approved 2019 Road Bond. RTG is the designer and James Construction is the contractor. A groundbreaking ceremony was held on Wednesday, June 30, at The Bridge Church. Construction is anticipated to be completed in summer 2023. The CR 137 to CR 404 segment is under design and the County is actively pursuing construction funding. 

*Please note, the first phase of this project is a two to three-lane road with one lane in each direction and potentially a center turn lane, as shown on the Interim Schematics. As traffic requires, a second frontage road, which will create divided lanes for each direction, and main lanes will be added if the County continues to grow and the need arises.

James Construction Group will be performing day work on May 31, 2023, between the hours 9 a.m. to 3 p.m. JCG will close one lane and shoulder on CR 137 from CR 139 to CR 197 to install final surface before switching traffic onto the new surface and closing the other side of the roadway. JCG will use a single lane flagging operation with radio communication. Minimal delays are expected. Work is weather pending.

 
Materials and Documents

*Please note, these are the ultimate roadway schematics. The first phase of this project is a two to three lane road: one lane in each direction and potentially a center turn lane, as shown on the Interim Schematics. Construction on the first phase of the frontage road is expected to begin late spring 2021 between SH 130 and CR 137. Future phases of construction will include the first phase, Interim Schematic, from CR 137 to the east. As traffic requires, a second frontage road, which will create divided lanes for each direction, and main lanes will be added if the County continues to grow and the need arises.

 
Project Map

SE_Loop_Segment3

 
Public Involvement

Williamson County wants to hear from you, and public input is encouraged. 

An open house was held on June 24, 2019. Comments from the open house were accepted through July 9, 2019. Materials from the meeting are available below. 

For more information or to submit comments, please reach out:

Email: roads@wilco.org
Call: 512-943-1195
Mail: Public Information Office, 710 S. Main Street, Suite 101, Georgetown, TX 78626
Updates: If you would like to receive e-mail updates, please send an email to roads@wilco.org with "Southeast Loop Updates" in the subject line.