CR 200
Location

From CMTA Railroad to CR 201/span>

Description

Reconstruct CR 200 to a two-lane roadway with a center turn lane and shoulders (3 lanes of an ultimate six-lane roadway) a distance of 1 mile.

Status

Final design refinements by O'Brien Engineering Services are underway, along with right of way acquisition and utility relocations. Construction is anticipated to begin in fall 2020 and be completed in summer 2022.

Contact Email [email protected] or phone 512-260-4280
 
Project Maps

To view a larger version click the picture. To save right click and click "save picture as"

 
Completed Projects

CR 200 from CMTA Railroad to CR 201 is Project 2 in a three-project improvement effort. Two previous construction projects have been completed along CR 200

Project 1
Improvements at SH29 and CR200/ Loop 332 were completed in summer 2019. The project spanned a distance of 0.2 miles and included adding turn lanes on SH 29, widening CR200 / Loop 332, installing a new traffic, signal, and relocating and isntalling a new waterline.

View Project Map

Project 3
Improvements for CR 200 at Bold Sundown were completed in November 2018. Improvements spanned a distance of 0.2 miles and included widening CR 200 and adding a left turn lane for Bold Sundown.

View Project Map