Location
|
Cotrell Street from W. Elm Avenue to Arnold Drive
|
|
|
Description
|
This project repaired and resurfaced the existing, damaged pavement to provide a smooth driving surface and included drainage ditches along the roadway to redirect water and prevent pavement erosion.
|
|
|
Status
|
The project was designed by CONSOR and constructed by Chasco Constructors. Construction began in Nov. 2021. A ribbon cutting ceremony was held on Feb. 17, 2022 for the completed project.
|
|
|