Location Five segments along existing Ronald Reagan Boulevard starting at RM 2243 and ending at I-35 in Precincts 2 and 3.

Description

The County is planning for the future corridor of Ronald Reagan Boulevard between RM 2243 and I-35, which is expected to be an ultimate eight-lane controlled-access roadway.

The only portion of the Ronald Reagan Blvd that has construction funding is within the limits of SH 29 and FM 3405.  This portion will look to construct a separate two-lane road to serve as the southbound frontage road of the ultimate eight-lane roadway and switch the existing roadway to a northbound only roadway, with a divided median. More information is available on that project page. Ultimately, as the county grows and funding is secured, the remaining roadway will be built, resulting in a controlled access roadway. This portion of the Ronald Reagan Project is a part of the County’s Long-Range Transportation Plan and was funded through the voter-approved 2013 Road Bond.


Ronald Reagan Corridor Planning Segment A (RM 2243 and SH 29)

Project Limits and Length: 3.7 miles from RM 2243 to SH 29

Status: The engineer, LJA Engineering, is working on planning for the roadway, which is anticipated to be complete in spring 2023.


Ronald Reagan Widening Segment B (SH 29 and north of FM 3405)

Project Limits and Length: 7 miles from SH 29 to north of FM 3405

Status: For information on this segment, please visit the project webpage here


Ronald Reagan Corridor Planning Segments C (FM 3405 and Williams Drive)

Project Limits and Length: 3.7 miles from FM 3405 and Williams Drive

Status: Status: The engineer, Volkert, Inc., is working on planning for the roadway, which is anticipated to be complete in spring 2023.


Ronald Reagan Corridor Planning Segment D (Williams Drive and SH 195)

Project Limits and Length: 5 miles from Williams Drive to SH 195

Status: Status: The engineer, Rodriguez Transportation Group, is working on planning for the roadway, which is anticipated to be complete in spring 2023.


Ronald Reagan Corridor Planning Segment E (SH 195 and IH-35)

Project Limits and Length: 6 miles from SH 195 to IH-35

Status: Status: The engineer, Pape Dawson, is working on designing the planning for the roadway, which is anticipated to be complete in spring 2023.


Contact

Email roads@wilco.org or phone 512-943-1195

 
Project Documents
 TitleOwnerCategoryModified DateSize 
Project Overview  7/27/2021192.91 KBDownload
Segment A RM 2243 to SH 29 Fact Sheet  12/9/2021319.30 KBDownload
Segment B SH 29 to FM 3405 Fact SheetConnie Odom 12/9/2021536.24 KBDownload
Segment C FM 3405 to Williams Drive Fact Sheet  3/2/2022385.19 KBDownload
Segment D Williamson Drive to SH 195 Fact Sheet  12/9/2021303.10 KBDownload
Segment E SH 195 to I-35 Fact Sheet  12/9/2021293.44 KBDownload
 
Project Map

Project Map for Ronald Reagan Corridor Planning