Location: north/south connector between Chandler Road and FM 1660
Overview: Williamson County conducted a study of Corridor E-1 to identify a north/south connector between Chandler Road and FM 1660. The County also studied Corridor A-1, an east/west connector between SH 130 and FM 3349. Because of the proximity of the study areas and the connection of the corridors, they were combined and became the Southeast Corridor Study. Two open houses were held on June 27, 2017, and August 24, 2017, to share information and collect input.
Status: This study has been rightsized to become the Southeast Loop Study, which considers connections for east/west travel between SH 130 and FM 3349 and north/south travel to US 79. This project will address the tremendous amount of growth and immediate transportation needs in the Hutto and Taylor areas. Materials and documents on this page are provided as archived information.
Please visit the Southeast Loop Study page for current information: www.wilco.org/seloop