Corridor E / East Wilco Highway Studies
Location North-south segments starting at I-35 north of Jarrell and ending at US 79 through Precincts 3 and 4.
Description

The county is conducting the Corridor E Planning & ROW Preservation Study as part of a planned ultimate controlled-access roadway in the central part of the county as an alternative north/south transportation corridor to IH 35. This study is made up of four segments that are a part of the county’s Long-Range Transportation PlanAll four segment studies were funded via the voter-approved 2019 Road Bond; however, there is no right-of-way or construction funding identified for any of the segments at this time. This study will serve as an important planning step to accommodate current and anticipated traffic levels to provide reliable transportation as the county continues to grow. By planning ahead, the County can best coordinate with property owners, businesses, and the community.

 
Corridor E2 Planning & ROW Preservation Study
Location Between US 79 and Chandler Rd
Project Limits and Length From US 79 to Chandler Rd, approximately 3.6 miles long
Status The engineer, BGE, Inc., is working on the study and schematic design of the Corridor, which is anticipated to be complete in summer 2023. 
 
Corridor E3 Planning & ROW Preservation Study
Location Between Chandler Rd and future SH 29
Project Limits and Length From Chandler Rd to future SH 29, approximately 4 miles long
Status The engineer, BGE, Inc., is working on the study and schematic design of the Corridor, which is anticipated to be complete in summer 2023. 
 
Corridor E4 Planning & ROW Preservation Study
Location

Between future SH 29 and CR 330

Project Limits and Length From future SH 29 to CR 330, approximately 5.5 miles long
Status The engineer, Halff & Associates completed the schematic design of the Corridor, which is anticipated to be complete in late 2022. 
 
Corridor E5 Planning & ROW Preservation Study
Location Between CR 305 and CR 330
Project Limits and Length From CR 305 at IH 35 to CR 330, approximately 9 miles long
Status The engineer, American StructurePoint, is working on the study and schematic design of the corridor, which is anticipated to be complete by fall 2023. 

 
Project Map

Corridor Es Graphic Map Updated