en-USes-MX
Ronald Reagan Corridor Planning
Location Five segments along existing Ronald Reagan Boulevard starting at RM 2243 and ending at I-35 in Precincts 2 and 3.

Description

The County is planning for the future corridor of Ronald Reagan Boulevard between RM 2243 and I-35, which is expected to be an ultimate eight-lane controlled-access roadway.

The only portion of the Ronald Reagan Blvd that has construction funding is within the limits of SH 29 and FM 3405.  This portion will look to construct a separate two-lane road to serve as the southbound frontage road of the ultimate eight-lane roadway and switch the existing roadway to a northbound only roadway, with a divided median. More information is available on that project page. Ultimately, as the county grows and funding is secured, the remaining roadway will be built, resulting in a controlled access roadway. This portion of the Ronald Reagan Project is a part of the County’s Long-Range Transportation Plan and was funded through the voter-approved 2013 Road Bond.


Ronald Reagan Corridor Planning between RM 2243 and SH 29

Project Limits and Length: 3.7 miles from RM 2243 to SH 29

Status: The engineer, LJA Engineering, is working on planning for the roadway, which is anticipated to be complete in early 2022.


Ronald Reagan Widening between SH 29 and north of FM 3405

Project Limits and Length: 7 miles from SH 29 to north of FM 3405

Status: Status: The engineer, CP&Y, Inc., is working on designing the roadway, which is anticipated to be complete in early 2022. Construction is expected to begin in late 2022. 


Ronald Reagan Corridor Planning between FM 3405 and Williams Drive

Project Limits and Length: 3.7 miles from FM 3405 and Williams Drive

Status: Status: The engineer, Volkert, Inc., is working on planning for the roadway, which is anticipated to be complete in early 2022.


Ronald Reagan Corridor Planning between Williams Drive and SH 195

Project Limits and Length: 5 miles from Williams Drive to SH 195

Status: Status: The engineer, Rodriguez Transportation Group, is working on planning for the roadway, which is anticipated to be complete in early 2022.


Ronald Reagan Corridor Planning between SH 195 and IH-35

Project Limits and Length: 6 miles from SH 195 to IH-35

Status: Status: The engineer, Pape Dawson, is working on designing the planning for the roadway, which is anticipated to be complete in early 2022.


Contact

Email [email protected] or phone 512-943-1195

 
Project Documents
 TitleOwnerCategoryModified DateSize 
FM 3405 to Williams Drive  7/27/2021286.44 KBDownload
Project Overview  7/27/2021192.91 KBDownload
RM 2243 to SH 29 Factsheet  7/27/2021319.60 KBDownload
SH 195 to I35  7/27/2021302.81 KBDownload
Williamson Drive to SH 195 Fact Sheet  7/27/2021306.53 KBDownload
 
Project Map

Project Map for Ronald Reagan Corridor Planning