CR 245
Location North of RM 2338 to Ronald Reagan Boulevard
Description   The CR 245 project consists of the reconstruction of the existing two-lane CR 245 to an interim three-lane roadway, with a center turn lane and right turn lanes at specific locations. The three-lane interim roadway will be part of the future ultimate six-lane roadway. The CR 245 project was funded through the voter-approved 2019 Road Bond and is meant to improve mobility around Georgetown and Sun City. The engineering firm for the project is Bridgefarmer & Associates, Inc.
Status Design of the project began in the summer of 2020. Construction is expected to begin in spring 2022 and is anticipated to be completed in spring 2023.
Contact Email [email protected] or phone 512-943-1195.
 