en-USes-MX
CR 305 at IH 35 Phase 1 Bridge Replacement
Location CR 305 at IH 35
Description

The project will replace the existing two-lane bridge at the intersection of CR 305 and IH 35. This is the Texas Department of Transportation's tenth Mobility35 project! The project includes reconstructing the CR 305 bridge over I-35 and realigning CR 304 East to connect to the new bridge.

Status Design was completed by H.W. Lochner, Inc. All right-of-way has been acquired. All utility relocations have been completed. The construction contract was awarded to Capital Excavation Company. The construction project is being managed by TxDOT. A groundbreaking ceremony was held Friday, September 21, 2018. A ribbon cutting ceremony was held on Friday, December 20, 2019. The project is complete. 
 
Contact Email roads@wilco.org or phone 512-943-3370
 
Documents
 TitleOwnerCategoryModified DateSize 
CR 305 Plan View Exhibit  09/03/2020UnknownDownload
CR 305 Schematic Exhibit  09/03/2020UnknownDownload
 
Project Map
CR 305 at IH 35 Phase 1 Bridge Replacement