Status
|
The design engineer is HNTB. The contractor is MA Smith Contracting. A groundbreaking is scheduled for Friday, April 29, at 10 a.m. at the southeast corner by the Walgreens parking lot. Construction is anticipated to be complete in summer 2022.
|