Ronald Reagan Widening
Location Ronald Reagan Boulevard from FM 3405 to SH 29
Description This project includes making the existing road northbound only and building separate two lanes to act as a second frontage road, which will be southbound only. Both roads will include turn lanes at intersections and shoulders.
Status

The engineer, CP&Y, is working on designing the roadway. They anticipate it will be finalized by summer 2022. For information on other segments of the Ronald Reagan Corridor Planning project, please click here. 

Lane Closure: Williamson County's contractor will set the concrete traffic barrier along the southbound side of Ronald Reagan Blvd. at Elizabeth Parkway on Thursday, Nov. 17. The work will take place between the hours of 8 p.m. and 5 a.m. Peace officers and one-way flaggers will help with traffic control. This is for the widening of southbound lanes on Ronald Reagan Blvd. and to allow for a left turn lane into Elizabeth Parkway.

Temporary Traffic Signal: A temporary signal has been installed at Ronald Reagan Blvd. and Santa Rita Blvd. A permanent light will be installed once the widening project takes place. 

Contact Email [email protected] or phone 512-260-4280.
 