The SH 29 Corridor Study is a study on the preservation of right-of-way for future road expansion and construction of this main east-west corridor. The study boundaries are from approximately one-fourth of a mile west of DB Wood Road in Georgetown to the Williamson/Burnet County Line.
A copy of the presentation portion of the open house held on August 4 is available for $1 by contacting 943-1663.
SH 29 Corrior Study Results Page and Information