Your browser does not support flash.
Minimize
Project Description

The SH 29 Corridor Study is a study on the preservation of right-of-way for future road expansion and construction of this main east-west corridor. The study boundaries are from approximately one-fourth of a mile west of DB Wood Road in Georgetown to the Williamson/Burnet County Line. 

A copy of the presentation portion of the open house held on August 4 is available for $1 by contacting 943-1663.

SH 29 Corrior Study Results Page and Information

 
Minimize
Project Documents

 TitleOwner TestCategoryModified DateSize Description
Property Values and HighwaysConnie Watson 8/5/2008260.74 KBDownload 
FAQs July 3, 2008Connie Watson 8/6/2008241.00 KBDownload 
Summary of Impacts for Primary CorridorsConnie Watson 8/8/200818.93 KBDownload 
Population Growth MapConnie Watson 8/6/2008930.08 KBDownload 
Historic Traffic Growth of SH 29Connie Watson 8/6/200813.69 KBDownload 
Traffic Projections for SH 29Connie Watson 8/6/200817.98 KBDownload 
Reasons for Eliminating Preliminary CorridorsConnie Watson 8/6/200810.07 KBDownload 
Information from Aug. 4 MeetingConnie Watson 8/6/20081.64 MBDownload 
Issues MatrixConnie Watson 8/5/200860.60 KBDownload 
Technical/Traffic MemoConnie Watson 8/5/20081.79 MBDownload 
Property Values Case StudyConnie Watson 8/5/2008133.51 KBDownload 
 
Minimize
Hwy 29 Newsletter


   Subscribe to the Highway 29 Distribution list.




Submit  

 
Alerts
alert